Obtain
Sanitary Permit from County Zoning or through Plumber or Soil Tester.
-
Apply for use permit from Local
Municipality.
-
Have 2 SETS of SITE and BUILDING
Plans.
-
Have
Energy Worksheet- SB5518 or Wis Rescheck filled out by Designer or HVAC
Contractor
-
List of
all contractors and proper certification numbers. Owner may draw and sign
permit app. but assumes all responsibility during the building process!!!!
-
Contact
Inspector. He will provide the necessary forms and state seal and approve
the 2 sets of site and building plans.
-
Always
plan ahead for 2 day window for inspections. Inspector has 48 hrs to
inspect after notification or construction may resume.
-
INSPECTION TYPES
-
Excavation and footing forms and possible soil erosion.
-
Poured footings and walls and drain tiles before backfill.
-
General rough framing
-
Rough electric
-
Rough Plumbing
-
Rough HVAC
-
Insulation and Vapor Barriers
-
Final
Occupancy mandatory, to insure no health or safety issues for
owners/occupants.
-
Code violations have 30 days to
rectify and bring into compliance.
-
Recall inspections will be
charged as per fee schedule and due at Final Occupancy.
-
Maintain soil erosion until site is stable and tracking onto public
roadways will be cleaned up daily or within 24 hrs.
-
Changes
in Building Plans must be approved by INSPECTOR reason; not to diminish
integrity of structure.
-
All inspections will be recorded
and posted at inspected areas.
-
A Building Permit lasts for 2
years even if exterior is not finished.
-
Any
questions during construction please call any time,
Cell # 608 574-3880
-
Further
Assistance — Dept of Commerce 608-266-3151 or e-mail
udctech@commerce.state.wi.us
Following
the PLAN and close communications will help your building process go
smoothly. Thank you.
Dennis A. Franek
|